

DRACO Rack Integration & Deployment
Rack integration, deployment & commissioning · Per project (typ. 2–8 weeks) · Pan-India · Fixed-fee per project
Key Specifications
See full specs ↓“RDP delivered and installed our edge AI pods across 6 sites with predictable INR pricing and onsite SLA.” — [customer / sector, to confirm]


Designed, built and supported in India — sovereign by design
Your AI factory on sovereign Indian infrastructure: data residency under DPDP, MeitY-recognised, ISO 27001 / SOC 2 deployment paths, and procurement on GeM.
Overview
RDP Rack Integration & Deployment turns boxes into a working AI cluster. Our engineers receive, rack, cable, power, cool, image and validate your GPU servers, networking, storage and PDUs — then hand over a tested, documented, production-ready deployment. It removes the integration risk and weeks of effort of standing up AI infrastructure yourself — delivered on-site, in INR, on a GST invoice.
Engineered around RDP’s GPU servers, rack-scale systems, fabrics, storage and cooling, the service covers physical build, power and cooling connection, fabric bring-up, software imaging and burn-in, with a clean handover and documentation.
Key highlights
- Turnkey build — racking, structured cabling, power and cooling connection, labelling and dressing.
- Fabric bring-up — InfiniBand/Ethernet fabric configuration, subnet manager, and validation.
- Software imaging — OS, NVIDIA/AMD stack, schedulers and the AI software stack pre-configured.
- Burn-in & validation — thermal, power and scaling tests before handover; issues fixed, not shipped.
- Documentation & handover — as-built diagrams, IPs, credentials process, runbook and acceptance.
- Pan-India onsite — RDP engineers at your site, with a clear SLA.
- Single accountable partner — one team for compute, fabric, storage, power and cooling.
- Make-in-India OEM — predictable INR pricing, GST tax invoice, GeM-procurable.
What’s included
- Physical build: receive, inventory, rack, cable and power the hardware.
- Power & cooling: connect PDUs, UPS and liquid cooling (CDU/manifold) and verify.
- Network: bring up the fabric, configure the subnet manager/RoCE, validate bandwidth.
- Software: image nodes, install the AI stack and scheduler, configure storage.
- Validation & handover: burn-in, scaling test, documentation and sign-off.
How it works
We scope the deployment, schedule the on-site engagement, then build, cable, power, cool, image and validate the system — running thermal, power and scaling tests before a documented handover. RDP coordinates the whole stack so you get one accountable partner. Honest note: timeline and scope depend on cluster size and site readiness — we confirm both in the statement of work.
Industry use cases
- Government & PSU — turnkey sovereign AI deployments on GeM.
- BFSI & healthcare — compliant, validated build-outs.
- Neocloud / AI providers — repeatable cluster deployment at scale.
- Manufacturing & energy — on-site integration at the facility.
- Research & higher-ed — institutional cluster stand-up.
- Enterprises new to AI infra — de-risked first deployment.
Outcomes — and how to be sure
The outcome is a tested, documented, production-ready AI deployment — not a pallet of boxes. Want certainty? Acceptance is against an agreed test plan (thermal, power, fabric bandwidth, scaling) before sign-off; you see the results and accept against them.
Scope & options
- DRACO service tier — full integration and deployment.
- Options: add managed operations, a scaling-test pilot, or staff training.
- Scale: from a single rack to a multi-rack supercluster — scoped per project.
On-prem vs DIY — the case
Doing the integration yourself ties up scarce engineers for weeks and carries real risk; an accountable partner delivers a validated system faster, with one throat to choke. RDP pricing is fixed in INR with a GST input-credit-eligible invoice — ask for a statement of work and a fixed-fee quote.
Integration & handover
We integrate the full RDP stack — GPU servers, fabric, storage, power and cooling — and hand over as-built documentation, a runbook and acceptance results, with knowledge transfer to your team. Optional managed operations available afterward.
Delivery & logistics
RDP engineers deliver on-site, pan-India, coordinating receiving, build, power/cooling connection and validation. (Exact schedule, on-site duration and site-readiness requirements confirmed in the statement of work.)
Engagement, warranty & support
- Engagement: Fixed-fee per project; timeline Per project (typ. 2–8 weeks).
- Coverage: Pan-India, with the agreed SLA.
- Support: warranty on integration work and an escalation path; optional AMC and managed ops (exact terms in the SOW).
Why RDP
14 years of Make-in-India infrastructure and 300,000+ devices shipped. Indian OEM, INR pricing, GST tax invoice, pan-India onsite engineers, GeM availability, and DPDP / sovereign-AI-ready deployment.
Buy with confidence
This is a turnkey integration and deployment service — talk to an RDP solution architect, get a statement of work, fixed-fee quote and acceptance test plan before you commit. Request a quote to begin.
Specifications
| Service Type | Rack integration, deployment & commissioning |
| Term | Per project (typ. 2–8 weeks) |
| SLA | Pan-India onsite, 4-hr response (per SLA) |
| Coverage | Pan-India |
| Engagement Model | Fixed-fee per project |
| Series | DRACO |
| Model fit | Deployment & commissioning |
Why RDP GPU Mart
- ✓ Make in India OEM — Hyderabad facility, 14 years, 300,000+ devices shipped.
- ✓ Sovereign-ready: India data residency (DPDP), MeitY-recognised, ISO 27001 / SOC 2 paths.
- ✓ INR-transparent: GST invoice, CGST/SGST or IGST, pan-India onsite SLA.
- ✓ Available on GeM for government and PSU procurement.
FAQ
Is GST invoicing available?
Yes — GST invoice, CGST+SGST or IGST by billing state, eligible for input credit.
Do you deliver and install pan-India?
Yes — pan-India delivery with onsite installation and a 3-year onsite SLA.
What warranty and support is included?
3-year pan-India onsite SLA with AMC and flexible financing options.
Can this be configured to my workload?
Yes — talk to an RDP solutions architect for a custom build or multi-node cluster.
Compare the range
Other Datacenter Infrastructure in this line
Swipe to compare
| QUASAR 42U 33 kW … | DRACO 250 kW Powe… | QUASAR 42U 20 kW … | QUASAR 42U 45 kW … | |
|---|---|---|---|---|
| GPUs | — | — | — | — |
| GPU memory | — | — | — | — |
| Model fit | AI rack power distribution | Backup power for AI racks | AI rack power distribution | AI rack power distribution |
| Networking | — | — | — | — |
| Chassis | — | — | — | — |
| Price | Request a Quote | On request | Request a Quote | Request a Quote |
| View | Quote | View | View |
Build the full stack
Pair it with








Designing a GPU cluster, not just one server?
Talk to an RDP solutions architect about the full fabric — networking, storage, rack and power.
*Pan-India delivery and onsite installation are subject to location serviceability; standard SLA terms apply. Specifications indicative; final configuration confirmed on quote.