

DRACO 48U 100 kW Liquid-Ready AI Rack
100 kW per rack · 2N PDU (A/B feeds) · 415V 3-phase, busway · Liquid-ready (DLC manifold) · 48U high-density rack
Key Specifications
See full specs ↓“RDP delivered and installed our edge AI pods across 6 sites with predictable INR pricing and onsite SLA.” — [customer / sector, to confirm]


Designed, built and supported in India — sovereign by design
Your AI factory on sovereign Indian infrastructure: data residency under DPDP, MeitY-recognised, ISO 27001 / SOC 2 deployment paths, and procurement on GeM.
Overview
The DRACO 48U 100 kW Liquid-Ready AI Rack is RDP’s flagship AI-ready rack — 100 kW per rack of capacity, 2N PDU (A/B feeds), busway distribution and direct-liquid-cooling provisioning, sized for the densest NVL-class GPU racks. It is the physical and power foundation the largest GPU deployments sit in, delivered integrated, cabled and validated with the compute it houses — on-premises, in INR, on a GST invoice.
Engineered to match RDP’s rack-scale systems and superclusters, it provides the structure, high-current power, cable management and liquid-cooling readiness that the densest AI hardware needs, with metered, monitored A/B power feeds.
Key highlights
- 100 kW per rack — flagship power density for NVL-class GPU racks.
- 2N PDU (A/B feeds) — 2N redundant, metered PDUs on A/B feeds for resilient power.
- 415V 3-phase, busway — busway-fed high-current distribution for the densest loads.
- 48U · 100 kW/rack — usable height and depth with structured cable management.
- Liquid-ready (DLC manifold) — manifold and rear-door provisioning for direct-liquid cooling.
- Per-outlet metering — visibility into power draw per server for capacity planning.
- Validated with RDP compute — delivered as part of a tested, powered rack.
- Make-in-India OEM — predictable INR pricing, GST tax invoice, pan-India onsite support, GeM-procurable.
Where it fits
- High-density GPU racks (primary): houses and powers liquid-cooled, NVL-class GPU racks.
- Rack-scale building block: the cabinet and PDU layer of a supercluster.
- Liquid-cooled halls: pairs with RDP CDUs and direct-liquid cooling.
- Colocation: the densest AI-ready cabinets in shared halls.
How it works
The rack provides structure, liquid-cooling provisioning (manifold, rear-door) and cable routing for GPU servers; 2N metered PDUs distribute busway power on A/B feeds with per-outlet metering. RDP sizes the rack, power and cooling readiness to your server density and facility. Honest note: usable power per rack depends on your facility feed and cooling — we size and validate it for your room.
Industry use cases
- AI data centres — house and power the densest GPU servers.
- Government & national labs — sovereign high-density AI infrastructure.
- Neocloud / hyperscale — maximum density per rack.
- BFSI & large enterprise — resilient 2N power for on-prem AI.
- Research & higher-ed — high-density racks for large clusters.
- Colocation — flagship AI-ready cabinets.
Performance — and how to be sure
We don’t publish inflated peak numbers. The honest picture: 100 kW per rack with 2N PDU (A/B feeds) powers the densest liquid-cooled GPU racks given a suitable facility feed. Want certainty? Request a power and rack assessment of your room before you buy; we’ll size the rack and PDUs and confirm usable capacity.
Series & scale path
- DRACO (flagship infrastructure tier) — this, the densest rack in the line.
- Density ladder: 20–45 kW air racks → 60–100 kW liquid-ready racks; add a Power & UPS block for resilient feeds.
- When to step up: add facility power and CDUs as the hall grows — talk to an architect.
Build vs buy — the TCO case
An integrated, validated high-density AI rack removes the cost and risk of assembling racks, busway, PDUs and cooling provisioning yourself. RDP pricing is fixed in INR with a GST input-credit-eligible invoice — ask for a rack and power TCO for your deployment.
Software & integration
Integrates with your facility: DCIM monitoring, per-outlet PDU metering, environmental sensors and alarms. Designed to match RDP rack-scale systems, CDUs and liquid cooling, and busway power.
Power, cooling & facility integration
A 48U high-density rack — plan busway feeds (A/B), grounding, and liquid-cooling connections (CDU/facility water). (Exact power, breaker and cooling figures confirmed in the design.) 2N metered PDUs and monitoring included.
Deployment, warranty & support
- Made to order, integrated, cabled and validated in India with the compute it houses; lead time confirmed at quote.
- In the box: rack, 2N metered PDUs, cable management, liquid-cooling provisioning, and integration; facility connection scoped at quote.
- Onsite warranty + AMC with pan-India coverage and an RMA/escalation path (exact terms confirmed at quote).
Why RDP
14 years of Make-in-India infrastructure and 300,000+ devices shipped. Indian OEM, INR pricing, GST tax invoice, pan-India onsite engineers, GeM availability, and DPDP / sovereign-AI-ready deployment.
Buy with confidence
This is a flagship AI-ready rack, made to order — talk to an RDP solution architect, get a power and rack assessment and a TCO before you commit. Request a quote to begin.
Specifications
| Series | DRACO |
| Cooling | Liquid-ready |
| Power Capacity | 100 kW per rack |
| Redundancy | 2N PDU (A/B feeds) |
| Rack Units / Footprint | 48U · 100 kW/rack |
| Distribution | 415V 3-phase, busway |
| Form Factor | Rack |
| Model fit | AI rack power |
Why RDP GPU Mart
- ✓ Make in India OEM — Hyderabad facility, 14 years, 300,000+ devices shipped.
- ✓ Sovereign-ready: India data residency (DPDP), MeitY-recognised, ISO 27001 / SOC 2 paths.
- ✓ INR-transparent: GST invoice, CGST/SGST or IGST, pan-India onsite SLA.
- ✓ Available on GeM for government and PSU procurement.
FAQ
Is GST invoicing available?
Yes — GST invoice, CGST+SGST or IGST by billing state, eligible for input credit.
Do you deliver and install pan-India?
Yes — pan-India delivery with onsite installation and a 3-year onsite SLA.
What warranty and support is included?
3-year pan-India onsite SLA with AMC and flexible financing options.
Can this be configured to my workload?
Yes — talk to an RDP solutions architect for a custom build or multi-node cluster.
Compare the range
Other Datacenter Infrastructure in this line
Swipe to compare
| QUASAR 42U 33 kW … | DRACO 250 kW Powe… | DRACO Rack Integr… | QUASAR 42U 20 kW … | |
|---|---|---|---|---|
| GPUs | — | — | — | — |
| GPU memory | — | — | — | — |
| Model fit | AI rack power distribution | Backup power for AI racks | Deployment & commissioning | AI rack power distribution |
| Networking | — | — | — | — |
| Chassis | — | — | — | — |
| Price | Request a Quote | On request | On request | Request a Quote |
| View | Quote | Quote | View |
Build the full stack
Pair it with








Designing a GPU cluster, not just one server?
Talk to an RDP solutions architect about the full fabric — networking, storage, rack and power.
*Pan-India delivery and onsite installation are subject to location serviceability; standard SLA terms apply. Specifications indicative; final configuration confirmed on quote.